Skip to content

MVP Release Planning

1. Overview

← Back to Product | ← Back to Main Page

This document defines the Minimum Viable Product (MVP) releases for the Ecolink project, detailing the scope, objectives, deliverables, and success criteria for each release phase. The MVP strategy follows an iterative approach, delivering incremental value while validating core hypotheses and gathering user feedback.

Release Strategy: - MVP1: Core platform functionality enabling basic recycling operations - MVP2: Gamification and educational content to drive engagement and behavior change - Future Releases: Advanced features, integrations, and optimizations


2. MVP Philosophy & Approach

2.1. Definition of MVP

An MVP is the smallest version of the product that delivers tangible value to users while enabling the team to: - Validate core assumptions about user behavior - Gather meaningful feedback for iterations - Minimize time-to-market and development risk - Establish technical foundation for future features

2.2. MVP Success Criteria

Each MVP must meet the following criteria before release: - ✅ All critical user stories completed and tested - ✅ No critical or high-severity bugs in scope - ✅ Performance meets non-functional requirements - ✅ Security audit passed - ✅ User acceptance testing (UAT) completed - ✅ Documentation updated (user guides, API docs) - ✅ Deployment to production environment successful

2.3. Release Cadence

Release Duration Sprints Target Date
MVP1 12 weeks 6 sprints (2 weeks each) Q1 2026
MVP2 12 weeks 6 sprints (2 weeks each) Q2 2026
MVP3 8 weeks 4 sprints (2 weeks each) Q3 2026

3. MVP1 - Core Platform (Foundation Release)

3.1. Vision Statement

"Enable UnB students and community members to register recyclable donations at smart EcoPoints and track their environmental impact through an intuitive mobile-first platform."

3.2. Target Users

  • Primary: UnB students seeking to contribute to sustainability initiatives
  • Secondary: Community members in the Federal District interested in proper recycling
  • Tertiary: System administrators managing EcoPoints and user accounts

3.3. Core Hypotheses to Validate

  1. H1: Users will adopt a QR-code-based donation system if the process takes <2 minutes
  2. H2: A simple, visual EcoPoint map will increase recycling station usage by >20%
  3. H3: Seeing donation history and environmental impact will motivate continued engagement
  4. H4: Mobile-first design will be the primary access method (>80% of users)

3.4. In-Scope Features

Epic-Level Scope

Epic ID Epic Name Priority Story Points
EP-001 User Authentication & Profile Management Critical 34
EP-002 User Interface & Experience Design Critical 37
EP-003 EcoPoint Location & Discovery Critical 29
EP-004 QR Code Access & Kiosk Integration Critical 21
EP-005 Donation Registration & Validation Critical 34
EP-010 Backend Services & API Critical 55
EP-011 Frontend Architecture & State Management Critical 21
EP-012 Security & Data Protection Critical 21

Total Story Points: 252

Feature-Level Breakdown

🔐 Authentication & Access - Email/password registration and login - Password reset functionality - User profile viewing and editing - Role-based access control (User, Admin, Cooperative Member) - JWT-based session management with 5-minute timeout at kiosks

🎨 User Interface - Login/registration screens - Responsive navigation (mobile bottom nav, desktop sidebar) - User dashboard with recycling summary - Donation history screen - EcoPoint map and list views - EcoPoint detail screen - Profile management screen - QR code scanning interface - Donation registration form

📍 EcoPoint Discovery - Interactive map with EcoPoint markers - List view with sorting by distance - Search and filter functionality - Distance calculation from user location - EcoPoint details (address, materials accepted, hours, status) - Navigation integration (Google Maps/Apple Maps)

📱 Donation Flow - QR code scanning at EcoPoint stations - Material type selection (Plastic, Glass, Paper, Metal, Electronics) - Weight/quantity input - Optional photo upload - Real-time validation - Success confirmation with donation summary - Invalid donation detection and feedback

📊 History & Tracking - Complete donation history with filters - Aggregate statistics (total kg, donation count) - Environmental impact metrics (CO2 saved, water conserved) - Individual donation details

🛠 Technical Infrastructure - RESTful API with authentication middleware - MongoDB/PostgreSQL database with optimized schema - React frontend with component architecture - State management (Context API/Redux) - Security hardening (encryption, input validation, CORS) - API documentation (Swagger/OpenAPI) - CI/CD pipeline (automated testing, deployment)

3.5. Out-of-Scope (Deferred to MVP2+)

  • ❌ Points and credit system
  • ❌ Gamification (badges, rankings, leaderboards)
  • ❌ Educational content CMS and library
  • ❌ Social sharing features
  • ❌ Advanced analytics dashboard
  • ❌ Multi-language support (only PT-BR in MVP1)
  • ❌ Push notifications
  • ❌ Offline mode/PWA functionality

3.6. Technical Requirements

Performance Targets

Metric Target Measurement Method
API Response Time (p95) <500ms Application Performance Monitoring
Page Load Time (FCP) <2s Lighthouse/WebPageTest
Database Query Time (p95) <100ms Query profiling
QR Code Scan Recognition <2s User testing
Concurrent Users Support 1,000 Load testing

Security Requirements

  • ✅ HTTPS/TLS 1.3 for all communications
  • ✅ Password hashing with bcrypt (10+ rounds)
  • ✅ JWT token expiration (7 days standard, 5 minutes at kiosks)
  • ✅ Input validation and sanitization (frontend + backend)
  • ✅ OWASP Top 10 vulnerability protection
  • ✅ LGPD compliance (data privacy, consent, export, deletion)

Browser Support

  • Chrome (last 2 versions)
  • Firefox (last 2 versions)
  • Safari (last 2 versions)
  • Edge (last 2 versions)
  • Mobile: iOS Safari 14+, Chrome Android 90+

3.7. Acceptance Criteria (MVP1)

Functional Acceptance: - [ ] A new user can register with email/password in <2 minutes - [ ] A registered user can log in and access their dashboard - [ ] A user can locate the nearest EcoPoint on a map - [ ] A user can scan a QR code at an EcoPoint within 10 seconds - [ ] A user can register a donation with material type and weight in <90 seconds - [ ] A user can view complete donation history with filters - [ ] Invalid donations are detected and do not appear in successful donation history - [ ] Admin users can manage EcoPoints (CRUD operations) - [ ] Kiosk sessions automatically timeout after 5 minutes of inactivity

Technical Acceptance: - [ ] All API endpoints respond within 500ms (p95) - [ ] Frontend loads in <2s on 4G connection - [ ] No critical security vulnerabilities (OWASP scan passed) - [ ] 100% of critical user journeys covered by automated tests - [ ] API documentation is complete and accurate - [ ] Application deployed to production with zero downtime

User Experience Acceptance: - [ ] System achieves >70% task completion rate in usability testing - [ ] Mobile responsiveness verified on iOS and Android devices - [ ] Accessibility audit shows WCAG 2.1 Level A compliance (minimum) - [ ] User satisfaction score >4.0/5.0 in UAT

3.8. Release Deliverables

Software Components: - ✅ Web application (React frontend) - ✅ Backend API (Node.js) - ✅ Database (MongoDB/PostgreSQL) - ✅ Deployment infrastructure (staging + production environments)

Documentation: - ✅ User Guide (onboarding, key features, troubleshooting) - ✅ API Documentation (OpenAPI/Swagger) - ✅ Admin Manual (EcoPoint management, user administration) - ✅ Technical Architecture Document - ✅ Database Schema Documentation - ✅ Deployment Guide

Testing Artifacts: - ✅ Test Plan and Test Cases - ✅ UAT Results Report - ✅ Performance Test Results - ✅ Security Audit Report

3.9. Sprint Breakdown (MVP1)

Sprint 1-2: Foundation & Authentication (4 weeks)

Goals: - Set up development environment and CI/CD pipeline - Implement backend API structure and database schema - Build authentication system (registration, login, password reset) - Create login/registration UI screens

Key Deliverables: - Backend API boilerplate with authentication endpoints - Database schema with users, sessions tables - Login and registration screens (responsive) - JWT authentication working end-to-end

Story Points: 42 | Risk: Medium (technical setup)


Sprint 3-4: EcoPoint Discovery & UI Core (4 weeks)

Goals: - Implement EcoPoint management (admin CRUD) - Build EcoPoint map with location services - Create main navigation and dashboard - Develop EcoPoint list and detail views

Key Deliverables: - EcoPoint CRUD API endpoints - Interactive map with EcoPoint markers - User dashboard with placeholder statistics - EcoPoint detail screen with navigation integration

Story Points: 84 | Risk: Medium (map API integration)


Sprint 5-6: Donation Flow & Finalization (4 weeks)

Goals: - Implement QR code scanning - Build donation registration flow - Create donation history and tracking - Finalize security hardening - Conduct UAT and fix critical bugs

Key Deliverables: - QR code scanner with EcoPoint validation - Donation registration form and API - Donation history with filtering - Security audit completed - Production deployment

Story Points: 126 | Risk: High (QR code hardware integration, UAT feedback)


3.10. Success Metrics (MVP1)

Adoption Metrics (First 30 Days): | Metric | Target | Stretch Goal | |--------|--------|--------------| | User Registrations | 200 | 500 | | Active Users (Weekly) | 50 | 150 | | Donations Registered | 300 | 800 | | EcoPoints with Activity | 5/10 (50%) | 8/10 (80%) |

Engagement Metrics: | Metric | Target | Stretch Goal | |--------|--------|--------------| | Average Donations per User | 2 | 5 | | Session Duration (avg) | 3 minutes | 5 minutes | | Return User Rate (Week 2) | 30% | 50% | | QR Scan Success Rate | 90% | 95% |

Technical Metrics: | Metric | Target | Acceptable Range | |--------|--------|------------------| | System Uptime | 99.5% | 99.0% - 99.9% | | API Response Time (p95) | <500ms | <800ms | | Error Rate | <1% | <2% | | Mobile Users | >70% | 60% - 90% |

Qualitative Feedback: - Conduct user interviews (n=10) within first 2 weeks - System Usability Scale (SUS) score >70 - Net Promoter Score (NPS) >30


4. MVP2 - Gamification & Education (Engagement Release)

4.1. Vision Statement

"Transform recycling into an engaging, rewarding experience through gamification and educational content, converting environmental action into academic recognition and community knowledge."

4.2. Target Users

  • Primary: UnB students motivated by academic credit incentives
  • Secondary: Competitive users seeking recognition through rankings
  • Tertiary: Waste picker cooperative members sharing educational content
  • Quaternary: Community learners seeking recycling knowledge

4.3. Core Hypotheses to Validate

  1. H5: Academic credit incentive will increase donation frequency by >50%
  2. H6: Leaderboards will create competitive dynamics driving >30% more donations
  3. H7: Badge achievements will increase user retention by >25%
  4. H8: Educational content co-created with cooperatives will be accessed by >60% of users
  5. H9: Users who consume educational content will have >40% lower invalid donation rates

4.4. In-Scope Features

Epic-Level Scope

Epic ID Epic Name Priority Story Points
EP-006 Credit & Points System High 39
EP-007 Ranking & Leaderboards Medium 18
EP-008 Badges & Achievements Medium 18
EP-009 Content Management System High 34

Total Story Points: 109

Feature-Level Breakdown

🏆 Points & Credits System - Automatic point calculation based on donation weight and material type - Point multipliers by material (e.g., Electronics: 2.0x, Glass: 1.2x) - Point deduction for invalid donations (-10 points) - Total points display on profile and dashboard - Points transaction history (earned/deducted) - Academic credit conversion (1000 points = 1 credit) - Credit request submission with student ID validation - Credit request approval workflow for admins - Credit request status tracking (Pending, Approved, Rejected)

📊 Rankings & Leaderboards - Global leaderboard (top 100 users) - University-specific leaderboard - Time-based filters (All Time, This Month, This Week) - User rank display with position change indicators - EcoPoint activity rankings - Privacy controls (opt-out of public rankings, anonymous mode)

🎖 Badges & Achievements - Achievement system with multiple badge categories: - Milestone badges (First Donation, 10 Donations, 50kg Donated) - Ranking badges (Top 10, Top 3, Monthly Champion) - Specialty badges (Material Specialist, Weekly Warrior) - Badge collection display on profile (earned in color, locked in grayscale) - Achievement progress tracking with percentage completion - Notification system for badge unlocks - Social sharing of badges

📚 Educational Content - Content Management System (CMS) for cooperative members - Rich text editor with media support (images, videos, embeds) - Draft/publish workflow with admin review - Content categories (Getting Started, Material Types, Preparation Tips, Impact Stories, Cooperative Insights) - Content library with search and filtering - Video tutorials with embedded player - Article reading interface with related content - Bookmark functionality - Content rating system (5-star reviews) - Content analytics (views, ratings, engagement metrics)

4.5. Out-of-Scope (Deferred to MVP3+)

  • ❌ Team/group challenges and competitions
  • ❌ Social features (following users, comments, community feed)
  • ❌ Advanced content types (quizzes, interactive tutorials)
  • ❌ Push notifications for achievements and rankings
  • ❌ Integration with external gamification platforms
  • ❌ Cryptocurrency/blockchain-based rewards
  • ❌ Merchandise redemption store
  • ❌ Augmented reality (AR) recycling guides

4.6. Technical Requirements

Performance Targets

Metric Target Measurement Method
Points Calculation Time <100ms Backend profiling
Leaderboard Load Time <1s Frontend performance monitoring
Content Page Load Time <2s Lighthouse
CMS Editor Responsiveness <200ms User interaction timing
Video Playback Start Time <3s Media performance testing

Data Requirements

  • Points algorithm must be transparent and auditable
  • Credit conversion must create immutable transaction records
  • Content versioning for draft/published states
  • Badge award events must be logged for analytics
  • Leaderboard calculations must be cached and updated hourly

4.7. Acceptance Criteria (MVP2)

Functional Acceptance: - [ ] Users automatically earn points based on donations with correct multipliers - [ ] Users can view points history with all transactions - [ ] Students can submit credit requests when threshold is met (1000 points) - [ ] Admins can approve/reject credit requests with notifications sent - [ ] Global leaderboard displays top 100 users sorted by points - [ ] Users can filter leaderboards by time period and university - [ ] Users receive notifications when badges are unlocked - [ ] Users can view badge collection with progress indicators - [ ] Cooperative members can create and publish educational articles - [ ] Users can browse, search, and bookmark educational content - [ ] Video content plays smoothly with playback controls - [ ] Content ratings are recorded and displayed accurately

Technical Acceptance: - [ ] Points calculation is consistent and reproducible - [ ] Credit transaction audit trail is complete and tamper-proof - [ ] Leaderboard updates reflect real-time data (max 1-hour delay) - [ ] Badge achievement logic is tested for all conditions - [ ] CMS supports rich media without performance degradation - [ ] Content is properly indexed for search functionality

User Experience Acceptance: - [ ] Points system is intuitive and motivating (feedback from UAT) - [ ] Leaderboards drive competitive behavior (tracked via analytics) - [ ] Badge unlocks create moments of delight (user feedback >4/5) - [ ] Educational content is engaging and accessible (>60% visit rate) - [ ] CMS is usable by non-technical cooperative members (SUS >70)

4.8. Release Deliverables

Software Components: - ✅ Points calculation engine - ✅ Credit management system - ✅ Leaderboard service with caching - ✅ Badge achievement engine - ✅ Content Management System (CMS) - ✅ Content library and reader interface

Documentation: - ✅ Points & Credits User Guide - ✅ Gamification Mechanics Documentation - ✅ CMS User Manual for Content Creators - ✅ Badge Achievement Catalog - ✅ Content Moderation Guidelines

Testing Artifacts: - ✅ Gamification Logic Test Suite - ✅ Content Workflow Test Cases - ✅ Integration Test Results (credits, rankings, badges)

4.9. Sprint Breakdown (MVP2)

Sprint 7-8: Points & Credit System (4 weeks)

Goals: - Implement points calculation algorithm - Build credit request and approval system - Create points display throughout UI - Integrate with UnB systems (if applicable)

Key Deliverables: - Points calculation service with material multipliers - Credit request API and admin approval workflow - Points dashboard widget - Transaction history screen

Story Points: 39 | Risk: Medium (UnB system integration)


Sprint 9-10: Gamification (Rankings & Badges) (4 weeks)

Goals: - Build leaderboard system with caching - Implement badge achievement engine - Create ranking and badge UI components - Set up notification system for achievements

Key Deliverables: - Leaderboard API with filters and caching - Badge definition system and award logic - Leaderboard screens (global, university-specific) - Badge collection interface - Achievement notification system

Story Points: 36 | Risk: Low


Sprint 11-12: Educational Content & Finalization (4 weeks)

Goals: - Build CMS for content creation - Implement content library and reader - Create search and bookmark functionality - Conduct UAT for gamification and content features - Fix bugs and optimize performance

Key Deliverables: - CMS with rich text editor and media upload - Content library with search and categories - Video player integration - Content rating and analytics - Complete MVP2 production deployment

Story Points: 34 | Risk: Medium (content moderation workflow)


4.10. Success Metrics (MVP2)

Gamification Adoption (First 30 Days Post-Launch): | Metric | Target | Stretch Goal | |--------|--------|--------------| | Users Earning Points | 90% | 95% | | Credit Requests Submitted | 20 | 50 | | Leaderboard Page Views | 500 | 1,200 | | Badges Unlocked (total) | 300 | 800 | | Users with 3+ Badges | 30 | 80 |

Engagement Impact: | Metric | Target | Stretch Goal | |--------|--------|--------------| | Donation Frequency Increase | +50% | +80% | | Return User Rate Increase | +25% | +40% | | Average Session Duration | 5 minutes | 8 minutes | | Social Shares of Achievements | 50 | 150 |

Educational Content Metrics: | Metric | Target | Stretch Goal | |--------|--------|--------------| | Content Library Visits | 60% of users | 80% of users | | Articles Published | 20 | 40 | | Video Views | 300 | 800 | | Content Bookmarks | 100 | 300 | | Average Content Rating | 4.0/5.0 | 4.5/5.0 |

Behavioral Impact: | Metric | Target | Measurement | |--------|--------|-------------| | Invalid Donation Rate Reduction | -40% | Compare users who viewed content vs. those who didn't | | Material Diversity per User | +30% | Track variety of materials donated | | Competitive Recycling Behavior | Observable | Qualitative analysis of leaderboard impact |


5. MVP3 - Advanced Features & Optimization (Future)

5.1. Vision Statement (Preliminary)

"Scale the Ecolink ecosystem beyond UnB through advanced features, multi-institutional support, and data-driven optimization for maximum environmental impact."

5.2. Potential Features (Subject to Prioritization)

🌐 Platform Expansion - Multi-university support (expand beyond UnB) - Multi-language support (Spanish, English) - Progressive Web App (PWA) with offline functionality - Native mobile apps (iOS, Android)

🔔 Engagement & Communication - Push notification system - In-app messaging - Email campaigns and newsletters - SMS reminders for inactive users

👥 Social Features - User profiles with social elements - Following/followers system - Community feed - Group challenges and team competitions - Comments and discussions on content

📈 Advanced Analytics - Personal impact dashboard with data visualizations - Predictive analytics for donation patterns - EcoPoint optimization recommendations - Environmental impact calculator with detailed metrics

🤖 AI & Automation - Image recognition for material classification - Chatbot for recycling questions - Personalized content recommendations - Automated content moderation

🏪 Rewards & Partnerships - Merchandise redemption store - Partnership with local businesses for discounts - Donation to environmental NGOs - Carbon offset certificate generation

🔬 Hardware Integration - Smart EcoPoint prototype with sensors - Weight measurement automation - Material identification via sensors - IoT dashboard for EcoPoint monitoring

5.3. Prioritization Approach

Future features will be prioritized based on: 1. User feedback from MVP1 and MVP2 2. Data-driven insights from analytics 3. Strategic partnerships and institutional support 4. Technical feasibility and resource availability 5. Environmental impact potential


6. Risk Management

6.1. MVP1 Risks

Risk Probability Impact Mitigation Strategy
QR code hardware unavailable/incompatible Medium High Develop manual code entry fallback; partner identification early
Low user adoption due to complexity Low High Extensive usability testing; iterative UI improvements
Performance issues under load Medium Medium Load testing before launch; scalable infrastructure
Security vulnerabilities discovered Low Critical Security audit before production; bug bounty program
Database schema changes needed Medium Medium Use migration tools; plan for downtime windows

6.2. MVP2 Risks

Risk Probability Impact Mitigation Strategy
UnB credit integration delays/rejection Medium High Engage with university early; have manual approval process backup
Gaming/cheating of points system Medium Medium Implement fraud detection; human review for credit requests
Low cooperative engagement in content creation Medium Medium Provide training and support; incentivize with recognition
Content moderation bottleneck Low Medium Clear moderation guidelines; escalation process
Leaderboard performance degradation Low Low Implement caching; optimize database queries

6.3. Cross-MVP Risks

Risk Probability Impact Mitigation Strategy
Team velocity below estimates Medium High Build buffer into sprints; prioritize ruthlessly
Key personnel unavailability Low High Documentation; knowledge sharing; cross-training
Technology stack limitations Low Medium Proof-of-concept critical features early
Budget constraints Medium Medium MVP scope flexibility; phased hardware investment
Regulatory/compliance changes (LGPD) Low Medium Legal consultation; compliance monitoring

7. Go/No-Go Decision Criteria

7.1. MVP1 Launch Criteria

Must-Have (Blockers): - ✅ All critical bugs resolved (P0, P1) - ✅ Security audit passed (no critical vulnerabilities) - ✅ Performance benchmarks met (API <500ms, Page load <2s) - ✅ UAT completed with >70% task success rate - ✅ Production environment stable and monitored - ✅ Rollback plan documented and tested - ✅ User support process established

Nice-to-Have (Non-Blockers): - ⚠️ All P2 bugs resolved (can defer to patch release) - ⚠️ WCAG 2.1 AA compliance (Level A acceptable for MVP1) - ⚠️ Admin analytics dashboard (manual reporting acceptable)

7.2. MVP2 Launch Criteria

Must-Have (Blockers): - ✅ Points system tested and accurate - ✅ Credit approval workflow functional - ✅ No regression in MVP1 features - ✅ Content moderation process operational - ✅ Performance impact assessed and acceptable - ✅ UAT for gamification features passed

Nice-to-Have (Non-Blockers): - ⚠️ All badge types implemented (can add more post-launch) - ⚠️ Advanced content analytics (basic metrics acceptable) - ⚠️ Social sharing for all achievement types


8. Post-Launch Support Plan

8.1. Monitoring & Alerting

System Health Monitoring: - Uptime monitoring (Pingdom/UptimeRobot) - Error tracking (Sentry) - Performance monitoring (APM) - Database performance metrics - User activity dashboards

Alert Thresholds: - 🚨 Critical: Downtime, database connection failures, authentication failures - ⚠️ Warning: Response time >1s, error rate >2%, low disk space - ℹ️ Info: High traffic, new user signups, feature usage patterns

8.2. Support Channels

User Support: - In-app help documentation - Email support: support@ecolink.com.br - FAQ section - Office hours (TBD based on resources)

Technical Support: - Developer on-call rotation - Incident response playbook - Escalation matrix - Post-incident review process

8.3. Update Cadence

Release Schedule: - Hotfixes: As needed for critical issues (<24 hour turnaround) - Patch Releases: Bi-weekly for bug fixes and minor improvements - Minor Releases: Monthly for new features post-MVP - Major Releases: Quarterly for significant updates


9. Feedback & Iteration Strategy

9.1. Data Collection Methods

Quantitative Data: - Google Analytics / Mixpanel for user behavior - Application logs for technical issues - Performance metrics from APM tools - A/B test results for UI/UX variations

Qualitative Data: - User interviews (n=10 per month) - In-app feedback forms - Net Promoter Score (NPS) surveys - System Usability Scale (SUS) surveys - Social media sentiment analysis

9.2. Iteration Process

  1. Weekly: Review analytics dashboards and support tickets
  2. Bi-weekly: Sprint retrospective with team learnings
  3. Monthly: User feedback synthesis and roadmap adjustment
  4. Quarterly: Strategic review and long-term planning

9.3. Pivot Triggers

Consider pivoting or significantly adjusting strategy if: - User adoption <50% of target after 60 days - Retention rate <20% at Week 4 - Critical hypothesis invalidated (e.g., users don't value credits) - Technical debt becomes unsustainable - Strategic partnership opportunities arise requiring scope change


10. Stakeholder Communication Plan

10.1. Internal Team Communication

Daily: - Stand-up meetings (15 minutes) - Slack/Teams updates on blockers

Weekly: - Sprint planning and retrospectives - Demo of completed work

Monthly: - Project status report - Roadmap review and adjustment

10.2. External Stakeholder Updates

UnB Administration: - Bi-weekly status updates - Demo before each MVP launch - Quarterly impact reports

Cooperative Partners: - Monthly meetings - Training sessions before MVP2 launch - Co-creation workshops for content

Users: - Launch announcements (email, social media) - Feature updates via in-app notifications - Monthly newsletter with impact metrics


11. Success Definition

11.1. MVP1 Success Criteria

Adoption Success: - ✅ 200+ registered users in first 30 days - ✅ 300+ donations registered - ✅ 50+ weekly active users - ✅ >50% of EcoPoints with at least one donation

Technical Success: - ✅ >99% uptime - ✅ <1% error rate - ✅ Performance targets met - ✅ Zero critical security incidents

User Satisfaction: - ✅ System Usability Scale (SUS) >70 - ✅ Net Promoter Score (NPS) >30 - ✅ Task success rate >70%

11.2. MVP2 Success Criteria

Engagement Success: - ✅ 50% increase in donation frequency vs. MVP1 - ✅ 20+ credit requests submitted - ✅ 60% of users visit educational content - ✅ 25% increase in user retention

Gamification Impact: - ✅ >90% of active users earning points - ✅ 300+ badges unlocked - ✅ Leaderboard viewed by >50% of users weekly

Content Success: - ✅ 20+ articles published - ✅ Average content rating >4.0/5.0 - ✅ Measurable reduction in invalid donations among content consumers


12. Conclusion

The Ecolink MVP strategy balances rapid delivery with quality and user value. MVP1 establishes the foundational platform for recycling operations, while MVP2 introduces engagement mechanisms to drive behavior change and sustainability education.

Key Success Factors: 1. User-Centric Design: Continuous feedback and iteration 2. Technical Excellence: Performance, security, and scalability 3. Strategic Partnerships: UnB, cooperatives, environmental organizations 4. Data-Driven Decisions: Analytics and metrics guiding roadmap 5. Sustainable Growth: Incremental value delivery and validated learning

By following this MVP release plan, the Ecolink team will deliver a product that not only meets user needs but also creates measurable environmental impact in the Federal District and beyond.


13. Revision History

Date Version Author Changes
2025-10-07 1.0 Mateus Vieira Initial MVP release planning document with detailed scope for MVP1 and MVP2

← Back to Product | ← Back to Main Page