Skip to content

Deliverables

← Back to Main Page

This document outlines the key deliverables planned for the Ecolink project, aligning with the sprint schedule and functional priorities defined for the CMS and EcoPoints modules.

Deliverable Description Associated Task Delivery Date Format Acceptance Criteria
EcoPoints Prototype Interactive map with filtering and static data for testing locations. Development of frontend integration using mocked data. 2025-05-04 Web component, frontend code, test cases. Points are displayed correctly on map with category filters working.
EcoPoints Module (MVP) Complete EcoPoints functionality including filters, geolocation, and API. Full integration with backend API and testing. 2025-05-18 Source code, API integration tests. Users can search and view EcoPoints. Filters and coordinates are accurate. Fully tested.
CMS Prototype (CRUD + Roles) Basic CMS to create, edit, and delete content by user role. CMS architecture and route prototyping. 2025-05-18 Admin panel UI, backend routes, user role logic. Admin and content editors can log in and manage content. Role restrictions apply correctly.
CMS Final Version Full CMS with validation, feedback, and responsive interface. Frontend refinement and testing. 2025-06-01 Functional CMS system, documentation. All content types can be created/edited with validation. Includes form feedback and preview.
Gamification System (stub) Basic backend structure for gamification with placeholder logic. Start database schema and gamification routes. 2025-06-01 Backend routes, models. Stubs are in place for credit generation based on recycling activity.
Student Area Prototype Area for students to view content, credits, and EcoPoints. Frontend development using existing data endpoints. 2025-06-10 UI component, navigation structure. Students can view EcoPoints, read articles, and see gamified score placeholder.
Final Version + UX Adjustments Project ready for delivery with adjustments from testing. Final QA and stakeholder feedback review. 2025-06-17 Packaged source, documentation, presentation slides. No critical bugs. Feedback incorporated. Ready for stakeholder delivery.
Documentation Technical and user documentation for all modules. Write deployment, API, and CMS usage docs. 2025-06-17 Markdown files. Complete and clear. Reviewed by technical and non-technical testers.

Revision History

Date Version Changes Authors
2025-04-08 0.1 Initial draft using Ecolink scope, sprint dates, and modules Mateus Vieira

← Back to Main Page